Alpine Shire Council Offices EV Chargers Installation

Delivered by Exel Group

Background

Exel Group was engaged by Alpine Shire Council to undertake a Design & Construct scope of works for 4 new Delta MAX Smart Electric Vehicles. The package was part of Alpine Shire Council’s Climate Action Plan 2021-24, with Exel assisting in selecting the Delta EV units to charge Alpine Shire Council’s electric vehicles which will eventually replace the existing fleet of fuel cars.

To enable the transfer over to Electric Vehicles, charging stations will be installed at the Shire’s head office located in 2-6 Churchill Ave, Bright.

Scope of Works

  • Design all cable routes, civil works and carpark upgrade following Alpine Shire requirements
  • Associate all design with Delta standards & Australian electrical and construction standards
  • Installation of 4 x Delta MAX Smart EV Chargers
  • Re-align all existing car park bays to suit location of new chargers
  • First charging bay to suit accessible parking/loading parking for larger EV vehicles
  • Upgrade of sub-grade and installation of 2 x asphalt carpark bays
  • EV Carparks to be line marked in green with EV Charge emblem & Alpine Shire slogan “100% Electric, Driving Change” signage
  • Upgrade existing MSB to accommodate new 125A circuit breaker for EV Charger distribution board
  • Installation of new 125A sub mains from main switchboard
  • Installation of 36 pole lockable EV Charger distribution board for Delta equipment, while allowing for expansion for future construction
  • Civil works associated with conduit installation
  • CAT6 communications cabling to Alpine Shire server room for remote communications to Delta MAX Smart
  • Installation of new footpath to access new car park bays
  • Test & Commissioning
  • Demonstration of EV Charge on Vehicle
  • Provide on-going technical support to Alpine Shire Council
Case study

Methodology

  1. Design, Planning permits & Approvals
  2. Procurement
  3. Site Establishment
  4. Construction
  5. In-person demonstration on operation of equipment (tested on Tesla)
  6. Handover & ASBUILT

 

Conclusion

Upon engagement, Exel Infragroup met with Alpine Shire representatives to confirm their organisation’s requirements. It was determined that the Delta MAX Smart unit catered for their needs, as Alpine Shire wanted to collect usage data that communicated back to their sever equipment.

Referring to both the Australian Construction Standards and Delta Installation Specifications, Exel were able to produce a practical design that would allow our installers to deliver a high quality design that met the customers expectations.

To confirm our assumptions on the Delta product, Exel management met with Delta Business Development Manager – Kal Gwalani. Kal provided Exel Infragroup with a great insight into the software associated with the MAX Smart unit while offering his ongoing support if needed.

Exel Group installers were able to complete the end to end project 3 week ahead of schedule, which was a positive result for the customer.

Exel will continue the relationship with Alpine Shire in any technical assistance they may need as their fleet looks to expand.

Overall, the project was deemed a success with all stakeholders involved communicating positive feedback. 